Monday, January 5, 2009

Aaron's work project 07/08

This was Aaron's last building project he finished in O8.He enjoyed doing something so different, and thought you might like to have a look too.
alt=""id="BLOGGER_PHOTO_ID_5288047042576500114" />
The stone area's will be planted as vinyard


alt=""id="BLOGGER_PHOTO_ID_5288047037756437058" />
Master Ensuite- the room at the end beyond the glass will fill with water and flow into the lake



Winter veiw from the Master bedroom deck

No comments: